![]() Sound masking technology was installed to limit the interruptions and noise from neighboring work spaces. In an open collaborative space, noise levels will be amplified, with more people sharing the same workspace. While technology may be visible or invisible in these settings, it is integral to how teams work in the environment. The intent of the design was to create a visually appealing atmosphere with soothing finishes which were selected to not only deliver and position the CardWorks brand and culture, but to also create a want to work space. Innovation is nurtured through informal, social, and creative interactions. The layout and design allows for workplace flexibility which enables teams and individuals to shape space on the fly for enhanced interaction. The breakroom and meeting rooms were designed to be a space for employees to congregate and are suited for conversation. Through careful pre-planning and detailed communications, the team delivered the transformational project with high end finishes and tons of natural light.įunction and aesthetics were equally important for this client to create an aesthetically pleasing and collaborative work space. This saved much needed time for the team for this fast track project. as a key member of the Ops Leadership Team. We used BIM 360 to create the rolling completion lists rather than waiting until the end of the project. The Senior Vice President, CC Operations, Case Management will report directly to the EVP, COO of CardWorks Inc. To address this, the team and trade partners were diligent in keeping rolling completion lists rather than a punch list. Facing the challenge of re-sequencing of the construction activities created a chaotic schedule and quality check order. The team drove quality workmanship from everyone throughout the project. The project included the complete gutting of the space and redesigning the entire interior. Why are card purchases useful To spread the cost of large purchases such as a holiday or TV. Having the right trades on board from the start, minimized punch lists items at the end and kept the project on track to be delivered on time. The Gilbane team paired with experienced trade partners to complete this project – relying on their understanding of the interiors renovations and their professionalism in delivering client excellence. Phase 2-4 included completion of the data center and addition of a generator. The project was completed in 5 phases, and in under three months, with the first phase being the office area. The space includes open office areas, meeting areas, conference rooms, breakrooms and a 2,500 SF Mission Critical Data Center to aid in their 24/7 operation. The 30,000 SF project was extremely fast tracked to renovate the floor into CardWorks flagship office. Gilbane provided construction management services for the interior fit-out of the fifth floor for CardWorks Processing. Fast track schedule achieves move in date
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |